About HNordic Wind

The people who will tell you if this is wrong for you

We install vertical axis wind turbines and battery storage on commercial properties. The question we answer first is not "how big a turbine do you want?" It is "does vertical wind make sense for your site?"

There is an easy version of this business. Someone calls asking about a wind turbine. You confirm it is a very good idea. You take the order.

We do not do that.

A vertical axis wind turbine is not right for every site. The mean wind speed at your location, the turbulence profile, the fuse size, the grid connection, the roof load capacity, whether battery storage is the better first step – all of that has to be understood before anyone specifies a turbine. Get the sequence wrong and you have spent capital on a system that underperforms. The energy projections in the brochure were written for ideal conditions. Your site is not ideal conditions.

What HNordic does is start with the site. We run an assessment, look at what the site actually produces in real wind conditions, and give you a straight answer. If vertical wind is not the right fit, we will tell you that. If it is, we will tell you what size, in what configuration, with what storage, and what the realistic numbers look like.

The relationship we are building is long-term. We install the system, and we stay – remote monitoring, maintenance, performance tracking against the projections we made at assessment. If the numbers diverge, we find out why. That is what we mean by accountability.

The people

Why this background, for this technology

The WindWhisperer is not a mainstream product sold by a mainstream energy business. It is a technically specific system installed in conditions – turbulent, multi-directional, rooftop, high-wind – where conventional turbines either do not work or shut themselves down. Understanding when and where it earns its keep requires an engineering background, not a sales background.

Rune Holm spent his career running systems that could not afford to fail. A ship's engine room is a closed system – no parts delivery, no specialist to call, no option to wait. That trains a specific capability: understanding the dependencies between components well enough to predict how a change in one part propagates through everything else. A wind and storage installation has the same kind of interdependencies. The turbine's output profile, the battery's state of charge, the building's demand curve – these are not three separate things. They are one system.

Thomas Emerald White brings a different lens. Twenty-five years at Deutsche Bank, Dow Jones, and across financial technology – finding the broken component that everyone else had stopped noticing because they had been looking at the same system for too long. In renewable energy installations, that broken component is almost always the financial architecture: a system designed and specified without accounting for what it does to the asset's value, its EPC rating, or its investment case at exit. Thomas built the structure that makes the investment case legible – to the owner, to a co-investor, and to a lender.

Rune Holm – Founder, HNordic

The right question before any installation is whether the site actually suits vertical wind. Rune is the person who answers that question – from site assessment through to the system performing as projected.

Rune's full profile →

Talk to Rune

Thomas Emerald White – Partner, HNordic

The investment case for a wind and storage installation is not just the energy bill reduction. Thomas has built the financial architecture around what it does to the asset – at refinancing, at sale, and across a portfolio.

Thomas's full profile →

Talk to Thomas

The structure

How HNordic Wind is organised

HNordic Wind is the wind and storage operating arm of H Nordic Exergy Limited, our group holding company incorporated in Ireland (No. 816416). For each country we operate in, we establish a local subsidiary – the business is compliant by design, not by retrofit.

Every installation is executed through a dedicated SPV, ring-fenced from the rest of the group. That matters when you are financing a property, planning a refinancing, or bringing in a co-investor. Clean structure, clear governance, no cross-contamination between projects.

The first step

Start with a site assessment

One conversation is usually enough to tell you whether vertical wind makes sense for your site. No commitment, no minimum size. Just the honest answer.

Book a site assessment